HDB Defects Checklist 2026: What to Check in Your New BTO Flat Before Renovating

A room-by-room defects checklist for new HDB flats, with HDB's rules: report within 1 month of key collection and before renovation, and the 1-year defects liability period.

SGInfoProperty Editorial
# HDB Defects# BTO Key Collection# Defects Liability Period# BTO Inspection# HDB Renovation# New HDB Flat

Last reviewed: 8 Nov 2026. HDB's defects rules checked against its Rectification of Defects in New Flats page (last updated 6 May 2026).

Inspect your new flat in the first week after key collection, and report what you find before your contractor starts work. HDB covers new flats with a 1-year defects liability period (DLP) from the date of key collection, but asks owners to report defects within 1 month of key collection and before renovation begins. Report late, or after the hacking and tiling have started, and you may end up arguing over whether a crack came from construction or from your renovation.

This guide covers HDB's process, what to bring, and a room-by-room checklist. The checks are practical methods, not HDB criteria: report anything that looks wrong, and HDB's Building Service Centre decides at the joint inspection what it will fix.

HDB's defects rules for new flats

Rule What HDB says
Cover 1-year defects liability period from the date of key collection
When to report Within 1 month of key collection, and before renovation works begin
How to report Scan the QR code in your Welcome Kit or on the notice on your kitchen wall, or go to the temporary Building Service Centre (BSC) near your block
What happens next The BSC arranges a joint inspection to verify the items, then assigns a contractor
How long repairs take HDB says it usually takes less than 2 weeks
If your renovation cannot wait HDB can fix defects during the renovation (if it does not get in the way) or after. Some minor defects can be fixed after you move in
When repairs are done The BSC arranges a closing inspection with you
After the 1-year DLP Repairs are yours. Under the Agreement for Lease, owners keep fittings and fixtures in good condition

HDB also advises not handing your keys to its rectification contractor. Bring your own lock to secure the flat.

Why reporting before renovation matters

HDB's reason for the 1-month window is simple: once your contractor has hacked, tiled or built carpentry, nobody can easily tell whether a defect was there at handover. A hollow floor tile under new vinyl, a wall crack behind a wardrobe or a leaking pipe under new cabinets becomes hard to prove and expensive to reach.

So build the inspection into your renovation plan:

  1. Key collection day: walk through, take photos, start the list.
  2. Within the first week: do the full room-by-room inspection below and submit the report.
  3. Joint inspection and repairs: HDB says repairs usually take under 2 weeks. Use this time to finalise your design, quotes and renovation permit.
  4. Renovation starts after the defects are fixed, or with your contractor aware of any items still open.

Our HDB renovation timeline shows where this fits from key collection to move-in, and HDB's renovation rules and permits covers what your contractor must apply for.

What to bring to the inspection

  • Phone with a camera and a notes app, and a charger to test the power points.
  • Masking tape or small sticky notes to mark each defect so it shows in photos and the contractor can find it later.
  • A coin or the handle of a screwdriver to tap floor and wall tiles and listen for hollow spots.
  • A torch for corners, cabinets, the household shelter and the ceiling.
  • A small spirit level (or a level app) for floors, door frames and window frames.
  • A bucket or pail of water to test bathroom and kitchen drainage and the service yard floor trap.
  • A lock for the main door, as HDB advises, for when repairs start.
  • A floor plan so you can label each item by room.

Room-by-room defects checklist

Main door and gate

  • Door opens and closes without rubbing the frame or floor
  • Lock, latch and handle work smoothly; all keys work
  • No dents, scratches or gaps in the door leaf and frame
  • Gate swings freely and the lock works

Walls and ceilings (every room)

  • No cracks, especially at corners, around door and window frames, and on the ceiling
  • Paint is even, without patches, drips, stains or bubbling
  • Walls look straight when you look along them with a torch held flat against the wall
  • No damp patches or water stains on the ceiling, especially under the bathroom above

Floors

  • Tap every tile: a hollow sound can mean the tile is not fully bonded
  • No cracked, chipped or stained tiles
  • Tiles are level with each other, without raised edges you can catch a foot on
  • Grout lines are even and complete
  • Skirting is attached along its whole length

Windows

  • Every window opens, closes and locks properly
  • Sliding panels run smoothly and stay in their tracks
  • No cracked or scratched glass
  • Rubber seals are complete; no gaps at the frame
  • Check for signs of water coming in at the frame after rain

Doors (bedrooms, bathrooms, household shelter)

  • Each door closes fully and latches without force
  • Hinges are tight and do not squeak or sag
  • No gap large enough to show the door is out of alignment
  • Household shelter door seals properly and its fittings are intact

Bathrooms

  • Pour water on the floor: it should flow to the floor trap and not pool
  • Run every tap and the shower; check water pressure and hot water points if installed
  • Flush the toilet several times; check it refills and does not leak at the base
  • No leaks under the basin or from pipe joints
  • Tap every wall and floor tile; check grout and sealant around the basin and toilet
  • Check the ceiling for stains that could signal a leak from the flat above

The 3-year rule matters here. HDB does not allow owners to replace the bathroom floor and wall finishes within 3 years of the block's completion date (overlaying the floor finishes with adhesive is allowed). So defects in the bathroom tiles are worth reporting now, because you cannot simply hack and redo them.

Kitchen and service yard

  • Kitchen floor and service yard floor drain to the trap without pooling
  • Taps and pipe points run without leaks
  • Gas point (if provided) is capped and undamaged; leave any gas work to a licensed gas worker
  • Wall tiles are complete and firmly bonded
  • Laundry rack brackets are firm

Electrical points and switches

  • Every switch turns its light point on and off
  • Plug your charger into every power point to check it works
  • Switch and socket plates are straight, undamaged and fixed firmly
  • The distribution board is labelled, and the circuit breakers are in the on position
  • Doorbell and intercom points work, if provided

Do not open up electrical points yourself. If something does not work, report it.

Household shelter

  • Walls and ceiling have no cracks
  • Door and ventilation openings work as intended

HDB's renovation guidelines say the shelter's reinforced walls, floor and ceiling, its steel door and its ventilation openings must not be tampered with during renovation. So report any defect there instead of trying to fix it yourself.

Recording and reporting defects

  • One item per line. Write the room, the location ("bedroom 2, left of window, 1 m from floor") and what is wrong.
  • Photograph each item twice: a close-up and a wider shot showing where it is. Your phone stores the date.
  • Mark each item with tape so you, HDB and its contractor are looking at the same spot at the joint inspection.
  • Submit everything in one report if you can, through the QR code or at the temporary BSC.
  • Keep the reference number and all photos until the closing inspection is done.
  • Do the closing inspection properly. Check every item on your list, not just a few, before you sign off.

If your renovation cannot wait

HDB says it can fix defects during your renovation, if the repair does not get in the way, or after. If you go ahead:

  • Give your contractor the defect list so they do not cover an unrepaired item with tiles, vinyl or carpentry.
  • Plan the order of work so the areas with open defects are done last.
  • Do not hand your keys to HDB's contractor. Arrange access with your own contractor or be there yourself.

Resale flats and condos are different

A resale HDB flat has no defects liability period. It is usually sold as-is, so anything you want fixed must be agreed with the seller before completion. See our HDB resale completion day checklist.

A new condo has its own defects process under the developer's sale and purchase agreement. The timing and procedure differ from HDB's, so check your agreement and our guide to TOP vs CSC for condo buyers.

After the defects are fixed

With the closing inspection signed off, you can start renovation with a clean record. Budget for the works with our renovation cost guide, and use the free renovation checklist below to plan each stage from contractor quotes to final inspection.